STRUCTURAL STEEL
Canmore WTP
For the Canmore Water Treatment Plant project, our team was proud to provide complete structural and miscellaneous steel services tailored to the needs of a modern municipal facility. This included the supply and installation of a full range of custom steel components, including metal decking, custom stair systems with railings, roof access ladders, and galvanized…
Chu Niikwan Place
Unified Engineering contributed to this project via the supply and installation of structural and miscellaneous steel components, including metal decking, custom steel stairs with guardrails, and wall-mounted handrails, all fabricated to meet site-specific requirements. Additional supplied items included pipe bollards, ramp railings, and a roof access ladder. Our team ensured smooth coordination and high-quality results,…
Pine Creek Pump Station
For the Pine Creek Pump Station project in Calgary, we supplied and installed custom structural and miscellaneous steel components, including roll-up door framing, protective pipe bollards, and modified steel headers tailored to site-specific requirements. Our team worked closely with project stakeholders to ensure seamless coordination, durability, and compliance with industrial standards.
Mickelson Golf Clubhouse
For this beautiful clubhouse project, we supplied and installed all key structural steel components based on the project’s detailed architectural plans. Our team worked closely with the contractor to ensure smooth coordination, reliable scheduling, and quality workmanship from start to finish.
Hood Packaging Expansion
This scope included the supply and installation of structural steel elements —including columns, beams, braces, and open web steel joists—along with a new metal deck at the high roof. Our team also reinforced existing joists at the low roof and carefully coordinated demolition of existing deck and framing following high roof completion, ensuring a smooth…
JACKSONPORT COMMERCIAL BLDG 1&2
Unified Engineering provided steel for a two building commercial development in N.E. Calgary. This fast-paced project required considerable coordination with our client and the design team. Erection was completed ahead of schedule, despite being done in Calgary’s harsh winter conditions.
- « Previous
- 1
- 2
- 3