Lakewood Pedestrian Bridge
Location Info
Strathmore, AB
Duration
1 months
Client/G.C.
PCL
Project Description
We fabricated and installed the structural steel for a new pedestrian bridge connecting the Hillcrest and Lakewood neighbourhoods.
The bridge crosses over the canal, providing residents with a safer and more convenient connection to the Lakewood community. It connects to an existing pathway in the Hillcrest area, creating an important pedestrian link between the two neighbourhoods.
Our scope of work included the supply and installation of structural steel for the pedestrian bridge, with a focus on quality workmanship, accurate installation, and meeting the project’s structural requirements.
The completed bridge provides a safe and practical pedestrian connection while improving accessibility for residents and the surrounding community.