MECHANICAL

PROJECT NAME: U OF C CRAIGIE HALL

LOCATION: CALGARY, AB

DURATION: 4 MONTHS

CURRENT STATUS:  COMPLETE

UEL SUPPLIED TWO NEW MECHANICAL SUPPORT FRAMES, COMPLETE WITH WALKWAYS AND RAILING, ABOVE AN EXISTING BUILDING ROOF AT THE UNIVERSITY OF CALGARY.

PROJECT NAME: OASIS FERTILITY

LOCATION: CALGARY, AB

DURATION: 5 MONTHS

CURRENT STATUS:  COMPLETE

CONSIDERABLE REINFORCING OF THE EXISTING ROOF STRUCTURE WAS REQUIRED PRIOR TO INSTALLING STEEL FRAMING TO SUPPORT A ROOF TOP AIR HANDLING UNIT AND GENERATOR.  CLOSE COORDINATION WAS REQUIRED TO ENSURE COMPATABILITY BETWEEN THE STEEL STRUCTURE AND MECHANICAL EQUIPMENT.

PROJECT NAME: BELL POP1

LOCATION: CALGARY, AB

DURATION: 7 MONTHS

CURRENT STATUS:  COMPLETE

GENERATOR SUPPORT STEEL WAS PROVIDED ATOP A 12 STOREY BUILDING IN DOWNTOWN CALGARY.  IN ADDITION, A CABLE TRAY SUPPORT STRUCTURE WAS INSTALLED BELOW THE 2nd FLOOR WHICH SIGNIFICANTLY INCREASED THE OWNER’S SYSTEM CAPACITY.

PROJECT NAME: EQUINIX CL3

LOCATION: 5300- 86th AVE SE, CALGARY, AB

CLIENT: ELLIS DON CONSTRUCTION SERVICES INC.

STATUS: COMPLETE

UEL SUPPLIED AND INSTALLED STRUCTURAL STEEL SUPPORT FRAMING AND MISC METALS FOR HVAC PLATFORM.