MECHANICAL

PROJECT NAME: http://www.agentz.us/18937-meclizine-price.html pilot U OF C CRAIGIE HALL

LOCATION: lincomycin injection price CALGARY, AB

DURATION: http://www.nebraskaweddingdetails.com/58061-effexor-cost.html 4 MONTHS

CURRENT STATUS:  https://www.abcmovers.net/51635-buy-stablon.html COMPLETE

UEL SUPPLIED TWO NEW MECHANICAL SUPPORT FRAMES, COMPLETE WITH WALKWAYS AND RAILING, ABOVE AN EXISTING BUILDING ROOF AT THE UNIVERSITY OF CALGARY.

PROJECT NAME: zera food recycler buy online OASIS FERTILITY

LOCATION: buy brand name synthroid CALGARY, AB

DURATION: Misoprostol 20mcg 5 MONTHS

CURRENT STATUS:  COMPLETE

CONSIDERABLE REINFORCING OF THE EXISTING ROOF STRUCTURE WAS REQUIRED PRIOR TO INSTALLING STEEL FRAMING TO SUPPORT A ROOF TOP AIR HANDLING UNIT AND GENERATOR.  CLOSE COORDINATION WAS REQUIRED TO ENSURE COMPATABILITY BETWEEN THE STEEL STRUCTURE AND MECHANICAL EQUIPMENT.

PROJECT NAME: BELL POP1

LOCATION: CALGARY, AB

DURATION: 7 MONTHS

CURRENT STATUS:  COMPLETE

GENERATOR SUPPORT STEEL WAS PROVIDED ATOP A 12 STOREY BUILDING IN DOWNTOWN CALGARY.  IN ADDITION, A CABLE TRAY SUPPORT STRUCTURE WAS INSTALLED BELOW THE 2nd FLOOR WHICH SIGNIFICANTLY INCREASED THE OWNER’S SYSTEM CAPACITY.